How to Start an Application

Start a Permit Application

Construction Equipment – Standard Plan Review

 

By following these instructions, you can avoid unnecessary data entry and help city staff to review and process your application more efficiently. 

Please use the correct instructions for your project type.

These Instructions

These instructions are written specifically for the following type of plan-based building permit application:

Scope of Work: Construction Equipment (cranes, hoists, etc.)
Review Program: Standard Plan Review

Different instructions are available if the scope of work is building construction or rehabilitation.

Background

In April 2019, the city council adopted an ordinance creating the 2019 Chicago Construction Codes. Unlike the pre-2019 Chicago Building Code, the Chicago Construction Codes are aligned with the widely adopted model building codes (I-Codes) published by the International Code Council, resulting in some significant changes in terminology. The 2019 Chicago Building Code (Title 14B) and 2019 Chicago Building Rehabilitation Code (Title 14R) became optional for most project types on December 1, 2019, and mandatory for all permit applications started on or after August 1, 2020 (with limited exceptions).

The City of Chicago is currently in the process of upgrading its online building permit interface (the Hansen Dynamic Portal). Unfortunately, the new system was not ready to launch at the same time as the new Chicago Construction Codes. These interim instructions will guide you through the steps needed to begin a building permit application using the Hansen Dynamic Portal, which does not currently reflect the terminology used in the 2019 Chicago Construction Codes, until that system is replaced.

Thank you for your patience and cooperation during this transitional period.

The Dynamic Portal (Hansen) and PDF Building Permit Application (Form 400)

To start a new plan-based building permit application, go to the Dynamic Portal (http://ipiweb.cityofchicago.org/DynamicPortal/) and log in using your unique account. (If you do not have an account, follow the instructions on that page to create one.)

To start a plan-based permit application, you must be an Illinois-licensed architect or structural engineer or a city-licensed expediter, and your license must be associated with your Dynamic Portal user account.

Once you have logged in to the Dynamic Portal, on the main page click “Apply for a permit.”

Several pieces of information that you will be required to provide in the Dynamic Portal portion of the application process will also be required when you fill out the PDF Building Permit Application (Form 400) during a later step of the permit application process. Form 400 reflects the new terminology and requirements of the 2019 Chicago Construction Codes.

It may be helpful if you begin filling out Form 400 before you log in to the Dynamic Portal.

It is your responsibility to make sure the information you provide in the Dynamic Portal matches the information you provide later when you upload a copy of Form 400. Inconsistencies between the two will delay issuance of your permit.

All permit-related forms, including Form 400, are available in the “Permit Forms” section of the Guide to Building Permits site.

Begin the Online Permit Application

The Dynamic Portal will guide you through several pages to gather basic information about your permit application. As noted above, some of this information must match the information you provide on the PDF Building Permit Application (Form 400) later in the process, so it may be helpful if you begin filling out Form 400 before you log in to the Dynamic Portal.

Note: Many options in the Dynamic Portal are tied to your license type. If you do not see the options described in these instructions, your account may not be configured correctly, or your license may be expired. Please contact eplan@cityofchicago.org for assistance. When requesting assistance with the Dynamic Portal, it is helpful if you include screenshots of the problem you are encountering.

Job Type

Select “New Construction with Plans” as the permit application type. (Use this selection for both new construction equipment and modifications to permitted construction equipment.)

In the “Other Construction” section, select either “Crane” or “Hoist”. Do not select multiple choices. 

screenshot

Click “Next Page.”

Job Location

Enter the same address used on the related building permit application.

You may provide partial address information.

screenshot

Click “Next Page.”

Address List

The system will attempt to validate the address you provide against the City’s address records. If the system identifies multiple possible addresses, please select the correct address from the list. 

If the address cannot be validated contact eplan@cityofchicago.org for assistance and include a copy of the original building permit for communication equipment at the site in your email. Do not proceed.

Do not pick an incorrect address that is “close enough.” It is very difficult to change the address after you start a permit application by paying the deposit fee, and this could delay processing of your permit application or require you to forfeit your deposit fee.

screenshot

Click “Next Page.”

Job Description

For “Review Program” select “Standard Plan Review.”

For “Type of Permit” select “Commercial Construction,” even if your project involves a different type of work.

For “Estimated Cost” provide the estimated cost of materials and labor for work to be performed under this permit. 

For “Description of the construction/proposed job” see the detailed instructions and examples provided.

screenshot

Click “Next Page.”

Application Detail: Building Information

Leave all fields in the “Building Information” section blank.

screenshot

Application Detail: Standard Submission Detail

Leave all fields in the “Application Standard Submission Detail” section blank.

screenshot

Application Detail: Zoning Information

Because zoning review is not required for temporary structures, you may place an “x” in each required field.

screenshot

Note: After completing the required fields on this page, you may save your application and return to it later. If you wish to do this, click “Save Application.”

To continue with the application, click “Next Page.”

Contractors and Contacts

On this page, you will be required to provide information about the permit applicant, property owner, design professional of record, and expediter (if applicable).

At this stage, you can also provide information about the general contractor and other contractors who will perform the work, but this information is not required for you to start the application. If you do not provide this now, you will be required to log in to the Dynamic Portal and add this information to the permit application before the permit application can be issued.

The system will use your credentials to identify your association with the permit application, either as an “Architect” or “Expediter.” This will be displayed on the initial page.

screenshot

Contractors and Contacts: Add Contractor

Click “Add Contractor” in the first section to add the design professional of record and any permit expediter involved in the project. (As noted above, you may, but are not required to, add other contractors at this stage of the application process.)

On the page which appears, you will be able to search for licensed individuals and entities either by name or license number.

screenshot

Mark the checkbox in the column labeled “Select” and then click “Add.”

Continue this process until you have added all contractors, then click “Return to main page.”

Contractors and Contacts: Add Owners/Contacts

Click “Add Individual Owner/Contact” in the second section to add the permit applicant and other property owners, as well as an emergency contact.

If the permit applicant (the person or entity whose name should print on the permit certificate) is the sole owner of the property, you do not need to enter any other information.

If the permit applicant is a tenant, you must also provide information about the property owner.

If the permit applicant is one of multiple owners of the property, enter the permit applicant first, then add each additional person or entity that owns 25% or more of the property.

If the permit applicant is a corporation, company, or similar entity, enter the first part of the name in the “First Name” field and the second part of the name in the “Last Name” field. (See example.)

If the permit applicant is corporation, company or similar entity, the Municipal Code requires that you identify any other individual or entity which owns 25% or more of that entity so that the
City can determine if any of these individuals or entities owe money to the city.

Failure to provide complete ownership information can delay issuance of your permit.

You are strongly encouraged to enter information for an “Emergency Contact” who will be available to respond if there is an emergency at the work site during construction.

screenshot

When you have finished entering information for each required contact, click “Next.”

If the contact information that you enter appears to match a record that already exists in the system, the system will ask you to confirm if the contact is the same.

When you have finished entering all contacts, click “Return to main page.”

Contractors and Contacts: Add Company Owner/Contact

Do not enter any information in this section for construction equipment permits.

Certification

On this page, review and accept the statements and agreements:

screenshot

Click “Next Page.”

Application Summary

Review the summary of information to verify that it is correct and complete.

You may click either “Previous Page” or “return to the beginning of the application process” if you need to change any of the data you entered.

The following information must match the information you provide on the PDF Building Permit Application (Form 400) which will be uploaded to ProjectDox:

  • “Job Location” must match “Address” (Form 400, Page 1).
  • “Estimated Cost” must match “Estimated cost of work” (Form 400, Page 1).
  • “Description” must match “Description of work” (Form 400, Page 1).
  • “Scope of Work” must be consistent with “Type of Work” (Form 400, Page 1).
  • Under “Contractors” the “Design Professional of Record” (Form 400, Page 6-DP) and “Expediter” (Page 6-EX), if applicable, must be listed. Other contractors may be added to the Dynamic Portal later. When added, this information must match Form 400, Page 5.
  • Under “Contacts” the “Permit Applicant” (Page 5) and “Emergency Contact” (Page 5) must be listed.

If you have not already started filling out a copy of the PDF Building Permit Application (Form 400), you should copy the information above to Form 400 before completing this step.

Click “Finish” if the information on the summary page is correct and complete.

Warning: You will not be able to make changes to the application data (other than listed contractors) after you click “Finish.”

Pay Initial Fees to Start Your Application

Status

On the “Status” page, you will see that a zoning fee and building permit deposit fee have been added to your application. You must pay these fees to “start” the application.

Click the “Add to Cart” button to add all unpaid fees to your cart.

screenshot

Click “View Cart/Checkout” in the panel on the left side of the page to pay the fees.

Cart / Checkout

Click “Check Out” to be taken to the City of Chicago’s eCheckout system where you will be asked to pay for all items in your cart.

If there are fees in your cart that you do not want to pay for yet, click “Remove” before clicking “Check Out.” You will be able to return fees to your cart from the Status page.

screenshot

After successfully completing payment using the eCheckout system, you will be returned to the Status Page, where you will be able to confirm that the fees have been paid.

Status Page

As your permit application is being reviewed, you may return to this page to add or change contractors who will be working under the permit once it issues. You must provide complete contractor information before the permit can be issued by the project manager.

screenshot

Continue Your Application Using ProjectDox

Invitation to Upload

Within one hour of your permit fee payment being processed, you will receive an email inviting you to continue the permit application process using the ProjectDox system. You may also directly access the City of Chicago’s ProjectDox system at http://planreview.cityofchicago.org/

Please contact eplan@cityofchicago.org for assistance if you do not receive an invitation or cannot see a record for your application number in ProjectDox after an hour. Include the application number in your email.

Upload Drawings and Documents

To continue the application process, you must upload drawings and other documents, including a completed version of the PDF Building Permit Application (Form 400), using the ProjectDox system. Once you indicate that these documents are ready for review by completing the “applicant upload task,” city employees will examine your application for compliance with code requirements.

For more information about the City of Chicago’s E-Plan process and ProjectDox, including a User Guide, please visit: https://www.chicago.gov/city/en/depts/bldgs/provdrs/e_plan.html.

When Your Permit is Ready

When your permit application has been approved and your permit is ready to issue, you will receive an email notification. You will be able to pay the balance of your permit fee either through the Hansen Dynamic Portal or at a Department of Finance in-person cashiering location. (If you are paying at an in-person location, make sure you know the 9-digit application number.) After you have paid the fee, you will be able to print a permit certificate from the Dynamic Portal (or, if you pay in person, receive one from the cashier). You will also be able to download approved copies of your construction drawings from the ProjectDox system.

Before Installation Begins

A copy of the permit certificate must be posted at the construction site and in a location visible from a public street or sidewalk before any work begins. A copy (either paper or electronic) of the approved construction drawings, downloaded from ProjectDox, must be on site at any time when work is occurring.

A copy of the permit certificate must remain posted and visible at the work site until work the equipment is completely removed from the site.

Cranes and hoists may only be operated by City-licensed crane operators or crane operator apprentices.

More Information

For more information about further steps in the process, including permit-related inspections, please visit http://www.chicago.gov/buildings.

If you need technical assistance with the Dynamic Portal or ProjectDox, please contact eplan@cityofchicago.org.